The Nova Scotia Regulatory and Appeals Board has ordered West Hants Regional Council to approve a development agreement for seven wind turbines, finding that its objections to fire protection and the development's effect on forested land were not supported by the evidence and the municipality's planning strategy.
The May 26, 2026 decision in Bear Lake Wind Ltd.'s appeal concerns the West Hants portion of an 11-turbine project. The other four proposed turbines are in neighbouring municipalities. It is a planning ruling, not a declaration that every permit needed to construct or operate the project has been obtained.
The three-member panel directed council to approve an agreement substantially matching the draft recommended by planning staff, including a requirement that an emergency exit road be gated.
Fire precautions had to be assessed against the evidence
Council rejected the application after a tied vote in September 2025. Its written reasons questioned the adequacy of a turbine fire-protection approach relying on passive suppression, and raised concerns about the pattern of development, including industrializing the forest and discouraging housing in the area.
Bear Lake argued that neither ground reasonably reflected the municipal planning strategy. The company is a joint venture between Everwind Fuels and Wind Strength, which the reasons identify as owned by the Mi'kmaq community of Membertou.
The municipality maintained that evaluating adequate fire protection was a planning judgment for council. Meeting an industry standard, it argued, did not necessarily answer whether the risk was acceptable in a forested setting near residential development.
The board accepted that elected councils have room to make planning choices. But it found that this refusal lacked the necessary evidentiary foundation.
The local fire chief had reviewed the revised project and raised no concern about access or evacuation routes. Although he regarded an active suppression system as preferable, he said the proposed passive system met industry standards and that the fire department's approach to a turbine fire would not change with an active system.
An engineer qualified to give expert fire-protection evidence supported the adequacy of the proposed measures. Those included continuous monitoring and automatic shutdown capabilities, together with requirements in the environmental approval and draft agreement. The municipality called no witness to contradict that evidence.
The agreement also required consultation with the fire chief, adequate emergency access, and equipment, training or infrastructure the chief reasonably considered necessary for an adequate response.
The board concluded that council could establish turbine design standards through its planning documents. It could not refuse this proposal based on a standard unsupported by the evidence or a reasonable reading of the existing strategy. That finding was specific to the application and record before the panel; it was not a general ruling that turbine fires present no risk.
Resource policy did not prioritize more housing
The board also rejected the municipality's reliance on the development pattern the project might create.
The proposed turbines were in a General Resource zone, where the planning strategy gave priority to resource activities and limited the development of land for non-resource uses. Utility-scale wind projects were expressly contemplated through development agreements outside designated growth centres, villages and hamlets.
Council was concerned about introducing large energy infrastructure into a forested landscape. Residents who participated expressed differing views: some opposed the project's potential environmental and visual effects, while others supported benefits including improved emergency access.
The board accepted planning evidence that wind generation and forestry already coexisted in the region. It also found that the proposal met applicable separation requirements and that the planning strategy did not support prioritizing residential expansion in this resource area.
The panel emphasized that planning staff's recommendation did not bind council, and that more than one outcome can sometimes reasonably fit a planning strategy. Here, however, the refusal was not connected to sound planning reasons supported by the record.
Approval order is not a construction update
The appeal was allowed and council was directed to approve the development agreement. The reasons also recognize that certain transportation and other matters remained subject to approvals from the responsible authorities.
The municipality's project page, checked on Oct. 29, links the May decision but does not establish whether the agreement has since been signed or all later permits obtained. The materials reviewed for this report do not establish the project's present construction status or a later court outcome.